Topic 4.5.1: Validating the Process Model

  • Use the File / Validate menu to initiate a validation of the Process Model database. Validation consists of a verification of the following elements:
    • All automatic phases have tag assignments for (minimally) the Start, Reset, Ready, and Done phase control and status bits.
    • All semi-automatic phases have tag assignments for (minimally) the Start, Reset, Ready, and Done phase control and status bits.
    • All tags assigned to an Edit Allowed or Edit Required actual element of a formula parameter must have a read/write access mode.
    • At least one equipment status has been defined.
    • One of the defined equipment statuses has been assigned as the default status.
Last modified: Friday, 22 May 2020, 2:18 PM